Hello,
I am trying to find the best Power-On sequence for my PnP machine.
I have an enclosure with complete electronics where the Duet 3 Main Board 6XD and Duet 3 Mini 5+ are. From the enclosure to the head of the machine, I run the +24V and CAN-FD lines for two Duet 3 Expansion Board 3HC-s.
The computer on which the complete machine runs is outside of the enclosure, and I run the USB cable through the panel connector to the Duet 3 Main Board 6XD, and also the LAN.
The problem I am facing is that if I Power on the computer first, the USB will power Duet 3 Main Board 6XD, and when I activate the Main Switch located on the enclosure, power will be delivered to servo drives and +24V PSU which delivers power to Duet 3 Mini 5+ and two Duet 3 Expansion Board 3HC-s in the head of the machine. In this sequence, all three boards do not initialize properly, I need to run M999 in DWC then everything is ok, all boards are synchronized perfectly and the machine is working as it should.
Option two is, when the computer is turned off and there is no power over USB, I activate the Main Switch on the enclosure to power up the servo drives and +24PSU, all Duet boards power on inside of the enclosure and in the head of the machine in the same time then I turn on the computer and I can see all boards are connected/synced successfully.
Is there a way to combat this, for example using only data cable for USB (without +5V) or something else so that if the computer is powered on first I do not have an issue if the +24V is powered on after, what would be the best approach to this?
Thank you,