DWC Reports NA for Time Estimates
-
This is somewhat tied to the thread I created on the Firmware side. https://www.duet3d.com/forum/thread.php?id=2237
DWC should not report NA for the time remaining estimates once the filament used has met or surpassed the total reported for the print. DWC should still be able to calculate estimated time remaining based on layer time and file progress. It seems that the Firmware already does this properly as it gives an estimate on the Panel Due based on layer time and file progress.